Closed
Bug 800092
Opened 12 years ago
Closed 12 years ago
vcs2vcs: prep for releases-mozilla-beta in production use by b2g
Categories
(Release Engineering :: General, defect)
Release Engineering
General
Tracking
(Not tracked)
RESOLVED
FIXED
People
(Reporter: hwine, Assigned: hwine)
References
Details
(Whiteboard: [reit-b2g])
b2g will start using releases-mozilla-beta repository from github as the uplift occurs. Must ensure it's ready to handle the load, to avoid repeat of bug 799843 This work is not blocked by branch contents or status, so can be completed any time prior to the merge.
Comment 1•12 years ago
|
||
hwine: we're in the final week before the merge. Can you please post an updated status? Any patches needed? Thanks.
Assignee | ||
Comment 2•12 years ago
|
||
There will be no patches needed to any of the existing release tooling. All adjustments will be happening in the vcs2vcs system.
Whiteboard: [reit-b2g]
Assignee | ||
Comment 3•12 years ago
|
||
repo is ready to go on github-sync3, waiting for completion of uplift to activate.
Assignee: nobody → hwine
Status: NEW → ASSIGNED
Assignee | ||
Comment 4•12 years ago
|
||
It's activated, and gecko-18 is updating on git.mozilla.org/release/gecko.git
Status: ASSIGNED → RESOLVED
Closed: 12 years ago
Resolution: --- → FIXED
Updated•11 years ago
|
Product: mozilla.org → Release Engineering
Updated•7 years ago
|
Component: Tools → General
You need to log in
before you can comment on or make changes to this bug.
Description
•